Legislative Library

 

Legislative Assembly > Legislative Library > Library Catalogue >

 

BC Government Publications
Index for:
British Columbia. Environmental Assessment Office
Environmental Impact Statement for Site C Clean Energy Project

Environmental Impact Statement Submission Cover Letter dated January 25, 2013
Volume 1 - Table of Contents
Volume 1 - List of Appendices
Volume 1 - Executive Summary
Volume 1 - Authorship
Volume 1 - Abbreviations and Acronyms
Volume 1 - Definitions
Volume 1 - Table of Concordance
Volume 1 - Section 1 Introduction
Volume 1 - Section 2 - Proponent Description
Volume 1 - Section 3 - Project Overview
Volume 1 - Section 4 - Project Description
Volume 1 - Section 5 - Need for, Purpose of, and Alternatives to
Volume 1 - Section 6 - Alternative Means of Carrying Out the Project
Volume 1 - Section 7 - Project Benefits
Volume 1 - Section 8 - Assessment Process
Volume 1 - Section 9 - Info Distribution and Consultation
Volume 1 - Appendix A - Vegetation, Clearing, and Debris Management Plan
Volume 1 - Appendix B - The Reservoir Filling Plan
Volume 1 - Appendix C1 - Draft Construction Materials Development Plans - Impervious Till Core Material Source Development Plan - 85th Avenue Industrial Lands
Volume 1 - Appendix C2 - Draft Construction Materials Development Plans - Quarry Development Plan - Wuthrich Quarry
Volume 1 - Appendix C3 - Draft Construction Materials Development Plans - Quarry Development Plan - Portage Mountain Quarry
Volume 1 - Appendix C4 - Draft Construction Materials Development Plans - Quarry Development Plan - West Pine Quarry
Volume 1 - Appendix C5 - Draft Construction Materials Development Plans - Pit Development Plan - Del Rio Pit
Volume 1 - Appendix D - Need for and Alternatives to the Project Supporting Documentation; Part 1 of 3 (Cover sheet)
Volume 1 - Appendix D - Need for and Alternatives to the Project Supporting Documentation; Part 2 of 3 (2007 BC Energy Plan)
Volume 1 - Appendix D - Need for and Alternatives to the Project Supporting Documentation; Part 3 of 3 (BCUC Resource Planning Guidelines)
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 1 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 2 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 3 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 4 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 5 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 6 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 7 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 8 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 9 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 10 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 11 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 12 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 13 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 14 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 15 of 16
Volume 1 - Appendix E - Review of Alternate Sites on the Peace River; Part 16 of 16
Volume 1 - Appendix F - Project Benefits Supporting Documentation
Volume 1 - Appendix G1 - Public Information Distribution and Consultation Supporting Documentation - Public and Stakeholder Issues and Interests Tracking Table
Volume 1 - Appendix G2 - Public Information Distribution and Consultation Supporting Documentation - Regional and Local Government Liaison Program Summary and Issues and Interests Tracking Table
Volume 1 - Appendix G3 - Public Information Distribution and Consultation Supporting Documentation - EIS Guidelines Public Comment Tracking Table
Volume 1 - Appendix G4 - Public Information Distribution and Consultation Supporting Documentation - BC Hydro-Led Public Consultation Activities and Materials
Volume 1 - Appendix G5 - Public Information Distribution and Consultation Supporting Documentation - Public Inquiries
Volume 1 - Appendix G6 - Public Information Distribution and Consultation Supporting Documentation - Public Information Materials
Volume 1 - Appendix G7 - Public Information Distribution and Consultation Supporting Documentation - Community Outreach Materials
Volume 1 - Appendix G8 - Public Information Distribution and Consultation Supporting Documentation - Business Liaison Program
Volume 1 - Appendix H - Aboriginal Information Distribution and Consultation Supporting Documentation
Volume 1 - Appendix I1 - Government Agency Information Distribution and Consultation Supporting Documentation - EIS Guidelines Review Government Agency Issues Tracking Table
Volume 1 - Appendix I2 - Government Agency Information Distribution and Consultation Supporting Documentation - Site C Environmental and Socio-Economic Technical Advisory Committees Process Report, 2008 and 2009, Executive Summary
Volume 1 - Figure 2.1 - BC Hydro Generation
Volume 1 - Figure 3.1 - Site C project development schedule
Volume 1 - Figure 4.1 - Regional overview
Volume 1 - Figure 4.2 - General project location and regional topography
Volume 1 - Figure 4.3 - Peace River regional post-contact development timeline
Volume 1 - Figure 4.4 - Treaty 8 territory with Section 20.1 Aboriginal groups identified
Volume 1 - Figure 4.5 - First Nations communities within 100 km of Site C Clean Energy Project
Volume 1 - Figure 4.6 - Land ownership in the vicinity of the Project
Volume 1 - Figure 4.7 - Order-in-Council flood reserve boundary
Volume 1 - Figure 4.8 - Environmentally sensitive areas and parks
Volume 1 - Figure 4.9 - Current land use
Volume 1 - Figure 4.10 - Transportation and infrastructure
Volume 1 - Figure 4.11 - Site C Project activity zone
Volume 1 - Figure 4.12 - General arrangement of dam, generating station, and spillways
Volume 1 - Figure 4.13 - Artist's rendition of dam, generating station, and spillways
Volume 1 - Figure 4.14 - Cross-section of earthfill dam
Volume 1 - Figure 4.15 - Gradations of earthfill dam construction materials
Volume 1 - Figure 4.16 - Plan of roller compacted concrete buttress
Volume 1 - Figure 4.17 - Cross-section of core buttress
Volume 1 - Figure 4.18 - Cross-section of dam buttress
Volume 1 - Figure 4.19 - Cross-section of powerhouse buttress and generating station
Volume 1 - Figure 4.20 - Cross-section of spillway and gated spillway buttress
Volume 1 - Figure 4.21 - Powerhouse and spillway plan
Volume 1 - Figure 4.22 - Water surface profiles from Peace Canyon Dam to Site C
Volume 1 - Figure 4.23 - Site C reservoir bathymetry, title 1 of 6
Volume 1 - Figure 4.23 - Site C reservoir bathymetry, title 2 of 6
Volume 1 - Figure 4.23 - Site C reservoir bathymetry, title 3 of 6
Volume 1 - Figure 4.23 - Site C reservoir bathymetry, title 4 of 6
Volume 1 - Figure 4.23 - Site C reservoir bathymetry, title 5 of 6
Volume 1 - Figure 4.23 - Site C reservoir bathymetry, title 6 of 6
Volume 1 - Figure 4.24 - Reservoir surface area and volume versus elevation
Volume 1 - Figure 4.25 - Substation and transmission line to Peace Canyon
Volume 1 - Figure 4.26A - Cross-section A - west of Jackfish Lake Road (looking east)
Volume 1 - Figure 4.26B - Cross-section B - east of Jackfish Lake Road (looking east)
Volume 1 - Figure 4.26C - Cross-section C - east of Jackfish Lake Road (looking east)
Volume 1 - Figure 4.27 - Alternative transmission line considered along the north bank
Volume 1 - Figure 4.28 - General arrangement of Highway 29 realignment segment at Lynx Creek
Volume 1 - Figure 4.29 - General arrangement of Highway 29 realignment segment at Dry Creek
Volume 1 - Figure 4.30 - General arrangement of Highway 29 realignment segment at Farrell Creek
Volume 1 - Figure 4.31 - General arrangement of Highway 29 realignment segment at Farrell Creek East
Volume 1 - Figure 4.32 - General arrangement of Highway 29 realignment segment at Halfway River
Volume 1 - Figure 4.33 - General arrangement of Highway 29 realignment segment at Cache Creek
Volume 1 - Figure 4.34 - North bank access roads to dam site area
Volume 1 - Figure 4.35 - South bank access roads to dam site area
Volume 1 - Figure 4.36 - Dam site area
Volume 1 - Figure 4.37 - Dam site sea - major construction operations
Volume 1 - Figure 4.38 - Stage 1 - river channelization
Volume 1 - Figure 4.39 - Stage 2 - river diversion
Volume 1 - Figure 4.40 - Dam, generating station, and spillways construction schedule
Volume 1 - Figure 4.41 - Site C substation and transmission line construction schedule
Volume 1 - Figure 4.42A - Highway 29 realignment construction schedule (1 of 2)
Volume 1 - Figure 4.42B - Highway 29 realignment construction schedule (2 of 2)
Volume 1 - Figure 4.43 - Access roads construction schedule
Volume 1 - Figure 5.1 - 2012 energy load forecast range (without LNG and before DSM)
Volume 1 - Figure 5.2 - 2012 peak demand load forecast range (without LNG and before DSM)
Volume 1 - Figure 5.3 - Contingency Resource Plan - capacity shortfall risks (MW)
Volume 1 - Figure 5.4 - Comparison of onshore wind 2010 Resource Options Report and onshore wind supply curve based on updated turbine efficiency and cost information (in $F2013)
Volume 1 - Figure 5.5 - Typical annual output from a run-of-river IPP
Volume 1 - Figure 5.6 - Sample wind generation during freshet period (June 2011)
Volume 1 - Figure 5.7 - Sample wind generation during wintertime (January 2012)
Volume 1 - Figure 5.8 - Portfolio analysis process
Volume 1 - Figure 5.9 - Scenario assumptions and variables
Volume 1 - Figure 5.10 - Portfolio comparison - average annual energy
Volume 1 - Figure 5.11 - Portfolio comparison - dependable capacity
Volume 1 - Figure 6.1 - Results for base case
Volume 1 - Figure 6.2 - Initial screening of alternates
Volume 1 - Figure 6.3 - Physical environmental relative footprints
Volume 1 - Figure 6.4 - Biological environmental relative footprints
Volume 1 - Figure 6.5 - Socio-economic environmental relative footprints
Volume 1 - Figure 6.6 - Relative functionality
Volume 1 - Figure 6.7 - Sensitivity analysis
Volume 1 - Figure 7.1 - BC Hydro electricity rate comparison, April 1, 2012
Volume 1 - Figure 7.2 - Cost of service indicative comparison (F2013 dollars)
Volume 1 - Figure 7.3 - Representative annual variability in BC Hydro system load and inflows

 

Downloaded by the Legislative Library of British Columbia for Archival Purposes